Projects

POKA3D has designed a substantial amount of significant and remarkable projects in almost every sphere of engineering.

Below you can find a brief collection of projects from the past few years, varying in scope and industry, presenting our skills in steel calculation and design, RC calculation and detailing, site engineering and inspection and mechanical projects. POKA3D also has extensive experience in power plant engineering – upgrades, expansions and retrofits as well.

Hospital - under construction in 20201500t completed out of the final 3500t

Main client: Canadian Steel Factory

Task: Complete steel detailing according to local standards and construction requirements

Manpower: Over 10 TEKLA modelers for almost one year

Swimming ComplexPrefabricated RC and Steel Structure in Norway

Main client: Norwegian City Council investment

Task: Designing the prefabricated concrete and steel structures of a swimming complex in Norway. The main structures of the building ( walls, deep beams, columns, ramp elements)were made of precast RC. The roof structures were made of prefabricated steel trusses with a maximal span of 34,00m. Other steel structures: HSQ beams, canopy structure. Total building area: appr. 3500m² Project accomplished in 6 months

Manpower: 3 Structural engineers 3 REVIT modellers 1 TEKLA modeller

Tunstead - Cement PlantSteel Project for the Cement and Mining Industry

Main client: Undisclosed - Cement Plant in Great Britain

Task: Fume gas duct and steel support design. Structural calculation from the beginning to the detailed fabrication drawings. Parts of steel support connecting to existing structure, geometry design based on 3D scan data of existing building.

Manpower: 2 Structural engineers 1 TEKLA modeller 2 Inventor modellers

4200 Kvartalet AskhøgdaResidential complex in Norway

Main client: Norwegian real estate developer

Task: Static calculation Structural design of prefab elements (columns, walls, beams, slabs, stairs) and steel parts (columns, beams, bracings) of the central building and the basement. 7000㎡ area, design ready in 6 months

Manpower: 3 Structural Engineers 3 REVIT modellers 1 TEKLA modeller

Mining Plant in MexicoSteel Project for the Mining Industry

Main client: Mining Plant in Mexico

Task: Fume gas ducts and steel support design. Structural calculation from the beginning to the detailed fabrication drawings. In high risk seismic zone.

Manpower: 3 Structural Engineers 6 Tekla Modelers

Cement Plant Steel Project for the Cement and Mining Industry

Main client: Cement Plant in Canada

Task: Fume gas duct and steel support design. Structural calculation from the beginning to the detailed fabrication drawings. Imperial system was used.

Manpower: 2 Structural Engineers 3 Tekla Modelers

Pipe support Oil IndustrySteel project

Main client: Oil Industry

Task: Structural calculation and TEKLA 3D design of the complete pipe rack. Lots of pipe support, cable trays and small details. Steel quantity: 68 tons - very detailed

Manpower: 2 structural engineers 4 TEKLA modelers

Pre-cast buildingConcrete project

Main client: Norwegian Construction Company

Task: Structural calculation and formwork and reinforcement

Manpower: 2 structural engineers 3 REVIT modelers

Transmission towerSteel Project

Main client: Belgian company

Task: TEKLA 3D modeling of existing tower,reinforcement, new arm and new climbing system.

Manpower: 2 TEKLA modelers

Pre-cast school buildingConcrete project

Main client: Norwegian Construction Company

Task: Structural calculation and formwork and reinforcement

Manpower: 2 structural engineers 4 REVIT modelers